3-Alarm Disaster of a Detention Pond Gets Remediated
Fire Department looks to the Construction EcoServices and Jacobs Engineering team to renovate their detention pond and bring it back to fully operational status.
...Fire Department looks to the Construction EcoServices and Jacobs Engineering team to renovate their detention pond and bring it back to fully operational status.
...It was the flood water forces resulting from Hurricane Harvey that damaged both the hillside and building to the extent that the building needed to be closed.
...Structural soil cells from Citygreen, called Stratavault, were chosen to provide 50,000 CF of soil for all the trees in the park. Stratavault is a modular design that provides structural support for...
It was the flood water forces resulting from Hurricane Harvey that damaged both the hillside and building to the extent that the building needed to be closed.
...The LID solution nearly eliminate a detention pond and in the process gained three additional lots, or 15% more homes
...Working with Construction EcoServices, the engineers at EHRA, Inc. rescued this project using Low Impact Development (LID).
...