WIN A $100
H-E-B GIFT CARD
ANSWERS
![CES Logo Small CES Logo Small](https://www.constructionecoservices.com/wp-content/uploads/2019/05/CES-Logo-Small-166x98.jpg)
If you answered these answers, you have been entered into the raffle.
1. Roughly, what percent of the world will suffer from water shortages by the year 2050?
A – 12%
B – 32%
C – 52%
D – 82%
2. What is a key trait LID?
A – It has less impact on the overall cost of a project
B – It mimics pre-development hydrology
C – It reduces flooding more than all other solutions
D – It is the most recommended solution on market
3. How often do stormwater systems need to be repermitted?
A – Every year
B – Houston does not require repermitting
C – Only right before a construction project is completed
D – Every five years
4. What is the #1 threat to water quality worldwide?
A – Plastic/microplastics
B – Silt and dirt (from erosion)
C – Rubber (from roadway runoff)
D – Nutrients (nitrogen/phosphorus)
5. What does SWPPP stand for?
A – Stormwater Pollution Prevention Plan
B – Stormwater & Wastewater Pipe Protection Plan
C – Stormwater Pipe Pollution Prevention Plan
D – Stormwater & Wastewater Pollution Protection Plan