3-Alarm Disaster of a Detention Pond Gets Remediated
Fire Department looks to the Construction EcoServices and Jacobs Engineering team to renovate their detention pond and bring it back to fully operational status.
...Hard Armor is a term used to describe permanent stabilization solutions which exist in many forms. Such solutions are indicated when water velocities in channels or ditches require very robust reinforcement to prevent erosion problems. We recommend products and systems that represent the most scalable solutions for projects large and small, while offering significant safety and value over poured in place concrete or rip rap.
ShoreFlex® is a permanent erosion prevention system that can be installed to shield channel side slopes and beds, pipe and culvert inlets/outlets, shoreline, and all most any place you may have hydraulic erosion protection needs.
ShoreFlex® is a high strength geogrid encapsulated in a matrix of 5,000 psi concrete blocks (6.5”x 6.5”x 2.25”) spaced 1.5” apart and attached to an erosion control blanket or high-performance turf reinforcement mat.
ShoreFlex Common Applications:
Fire Department looks to the Construction EcoServices and Jacobs Engineering team to renovate their detention pond and bring it back to fully operational status.
...It was the flood water forces resulting from Hurricane Harvey that damaged both the hillside and building to the extent that the building needed to be closed.
...Many Low Impact Development Practices were used, including bioretention, bioswales, vegetated structural roadway shoulders, permeable pavers and rainwater harvesting and reuse.
...The LID solution nearly eliminate a detention pond and in the process gained three additional lots, or 15% more homes
...Shoreloc is an Articulated Concrete Block System (ACB), that features an open grid, facilitating the flexibility of planting vegetation in the void spaces of the block. Shoreloc is adaptable to various topography and can be anchored to withstand water velocity and sheer stress on shorelines and in channels.
Fire Department looks to the Construction EcoServices and Jacobs Engineering team to renovate their detention pond and bring it back to fully operational status.
...It was the flood water forces resulting from Hurricane Harvey that damaged both the hillside and building to the extent that the building needed to be closed.
...Many Low Impact Development Practices were used, including bioretention, bioswales, vegetated structural roadway shoulders, permeable pavers and rainwater harvesting and reuse.
...The LID solution nearly eliminate a detention pond and in the process gained three additional lots, or 15% more homes
...I believe I started using your firm back in 2004/05, and haven’t ever regretted that decision.
ECO is well organized, detailed-oriented and has remarkable responsiveness when service requests are needed. In all our diversity we depend highly on. ECO to maintain their responsibilities they have become one of our most valuable and dependable assets of our organization for over eight consecutive years.
They are the first call I make when I need cutting edge information on green infrastructure implementation options and resources and they have always been willing and able to help.
WT Byler trusts the knowledge and expertise of Construction EcoServices for Stormwater Compliance on our projects.